Level 5

This is the top level of the layout. It contains one of what will eventually be 3 mountain peaks. It also has a reversing loop so that trains can turn around and descend the mountain to other levels but unfortunately, space constraints required that I make the loop with some 15-inch radius track which means that only small locomotives will be able to use it.